Hawaiian Isle for Auto Cover Construction
- Pool is being dug.
- Walls have been ste.
- Getting ready to pour concrete bottom.
- Concrete bottom has been poured.
- Bottom has been plastered.
- Tile has been laid on steps.
- Pool is being fill with water.
- Almost ready to swim.